EMC Partner IMU-MGS - Rent 4kV Surge & EFT Generator

EMC Parnter 4kV Test Generator:

  • 4.1kV Surge & 4.4kV EFT/Burst Test System 
  • Built-in 300v/16amps AC & DC CDN
  • System Control Software Included with Rental
  • EMC Partner Common Mode Test System Available
  • Current ISO 17025 Cal & 2 Days Free Transit Time

Optional Accessories


Included Items, View Packing List

Got Questions about the equipment? Get technical support

Two FREE days transit time with every rental

Request A Quote

IMU System Associated Equipment

IMU Series Video Guides

EMC Partner IMU Platform

This video explains the newest series of IMU test platforms by EMC Partner. It explains both the options of the IMU platform as well as applications and modular design.

IMU Series Generators

This video provided by EMC Partner, the manufacturer of the IMU/TRA test systems, provides system information about the capabilites of the IMU4000 and TEMA3000 Control software.

Data Sheet

Overview

Modular test system with colour touch screen and intuitive software. An integrated help with graphics guide the user through fast and efficient setup and operation. The system is used for CE mark testing in the European Union. Each system can be individually configured and easily extended. 10 modules are available for the IMU-MGS. All modules are easily added or removed by the user on-site.

The generator can be configured for IEC / EN and also ANSI test requirements. ElectroMagnetic Compatibility (EMC) tests for Surge up to 5kV and EFT up to 5kV are freely configurable by the user. IMU-MGS is programmed with default parameters from the IEC basic standards. A test library including basic and generic requirements is also included in the IMU-MGS.

Specifications

Common Standards

EN/IEC 61000-4-4 & EN/IEC 61000-4-5

IMU-MGS Mainframe

 

EUT power input 1 (CDN)

max. AC/DC 300V, 16A (fused 16A) with P module

EUT power input 2 (CDN)

max. AC/DC 300V, 16A (not fused) with P module

Internal CDN freq. range

DC, 50 Hz, 60 H

Power freq. synchr

50/60 Hz

Coupling Burst

L, N, PE, L+N, L+PE, N+PE, L+N+PE, direct out

Coupling Surge

2 Ω: L-N, direct out, 12 Ω: L-PE, N-PE

IMU-MGS Control Features


Operating system

 EPOS propietary firmware

EUT power monitor

supply voltage, current and freq. on screen

EUT supply current waveform

monitoring BNC output connector max. 15 V

EUT supply voltage waveform

monitoring BNC output connector max. 15 V

Surge voltage waveform

monitoring BNC output connector max. 15 V

Surge current waveform

monitoring BNC output connector max. 15 V

Trigger out

BNC connector, max. 6 V

Trigger in

auto, manual or via programmable BNC

Synchronization source

 EUT power, direct out, external

Synchronization angle

 

Standards

Common Standards for IMU Conducted Immunity Platform

  • IEC 61000-4-2 : Testing and measurement techniques - Electrostatic discharge immunity test.
  • IEC 61000-4-4 : Testing and measurement techniques - Electrical fast transient / burst immunity test.
  • IEC 61000-4-5: Testing and measurement techniques - Surge immunity test.
  • IEC 61000-4-8: Testing and measurement techniques - Power frequency magnetic field immunity test.
  • IEC 61000-4-9: Testing and measurement techniques - Pulse magnetic field immunity test.
  • IEC 61000-4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests.
  • IEC 61000-4-16 : Testing and measurement techniques - Test for immunity to conducted, common mode disturbances in the frequency range 0Hz to 150kHz.
  • IEC 61000-4-29: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations on d.c. input power port immunity tests.
  • IEC 61000-4-34: Testing and measurement techniques - Voltage, dips, short interruptions and voltage variations immunity tests for equipment with mains current more than 16A per phase

You may also like

Recently viewed