RTCA/DO 160 Section 22: Rent Lightning Transient Systems
Commonly required equipment for DO-160 Section 22:
Lightning Transient Generator
Oscilloscope
Injection Transformer
Current Probe
Attenuators
Voltage Probe
Monitor Loop
Calibration Loop
Capacitors (Dependent upon Ground)
LISNs
Section 20 requires 6 different voltage and current waveforms for compliance to all of the associated tests. Depending upon the cable type, coupling, and other factors will determine exactly which pulses are required. The main types of test required include pin injection, single and multiple stroke as well as multiple burst.
These different pulses are varified by and/or current monitoring or voltage probe allowing verification prior to testing. This standard includes 5 different test levels correlating to the how exposed the equipment is, 5 being the highest.
Section 22 of RTCA/DO 160 pertains to susceptibility (immunity) testing to the effecs of lightning on equipment that is designed to be used in airborne environments. This section requires 6 different voltage and current based waveforms using pin injection, single and mulitple stroke as well as multiple burst methods.